San Francisco cable car ‘big’ 19 on a test run. (Muni
The elevated Blue Line metro started passenger service on 4 September despite being officially inaugurated as long ago as 24 January 2023. 
 
At that time some trial journeys were carried out using a diesel locomotive to push-pull a metro set. The line links Marina and Mile 2 (13km with five stations) and is standard gauge with 15 Chinese-built four-car trains from CNR Dalian ordered as long ago as 2015. 
 
They operate at 750V dc from a third rail. 
A Blue Line train during trials. (Lagos Mass Transit)
A Blue Line train during trials. (Lagos Mass Transit) 
 
Tagged as: Lagos
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings